The industry average for made-to-order cabinets is 8–12 weeks. Craftsman Rapid ships in 2–3. Maker and Designer ship in 5–7, and Artisan Custom Shop in 6–8. Every order ships with a confirmed date.
Three things make Built's lead times real: direct manufacturer relationships, pre-configured production lines for our fastest cabinet series, and a team that communicates proactively rather than reactively.
Every order goes straight from Built to the manufacturer, no distributor, no redistribution warehouse. Fewer handoffs means fewer delays and a clear line of accountability when something needs attention.
Craftsman Rapid is designed from the ground up for speed. Pre-configured door styles and finishes mean production doesn't wait on custom engineering. The 2–3 week lead time is structural, not aspirational.
Every order ships with a confirmed date, so you can plan the build around it. Your Built Rep is your one point of contact from quote to delivery.
Every order goes through a quality check before it leaves the factory. Damage and discrepancy claims are handled immediately, not through a claim process designed to make you give up. We will make it right.
Cabinets ship factory direct to your delivery address, no local warehouse, no redistribution markup, no intermediate handling. They arrive fully assembled, factory finished, and ready to hang.
Builders running multiple units can lock in a standing spec, same lead time, same production lane, across every build. Spec once, repeat. No re-quoting, no re-confirming lead times for the same kitchen on a new lot.
On lead times, on delivery, on every order.